Mitigation option 1: Vegetation removal

Action: Vegetation clearance within and along the Loddon River near and downstream of the Pyrenees Highway bridge.

Modelling results indicate that in a 1% AEP event:

  • East of levee: water levels will drop by up to 15 cm
  • West of levee: water levels will drop by up to 30 cm
  • East of the levee: 2 fewer properties would experience water above the floor level
  • West of the levee: 1 less property would experience water above the floor level

Click maps to enlarge

Mitigation option 2: Raising the Newstead levee

Action: Raising the existing alignment of the levee (without making it longer).

Modelling results indicate that in a 1% AEP event:

  • East of the levee: water levels drop by up to 1.4 metres, and reduce the flooded area
  • West of the levee: water levels drop by up to 1.4 metres, and reduce the flooded area
  • 35 fewer properties East of the levee would experience water above the floor level
  • No additional properties West of levee would experience water above the floor level

Click maps to enlarge

Mitigation option 3: Raising and extending the levee

Action: Raising and extending the existing alignment of the levee.

Modelling results indicate that in a 1% AEP event:

  • East of levee: water is contained
  • West of levee: water levels go up by up to 30cm, in some locations along the Loddon River
  • 88 fewer properties East of the levee would experience water above the floor level
  • No additional properties West of the levee would experience water above the floor level

Click maps to enlarge

Mitigation option 4: Removing the bridge (Pyrenees Highway Bridge)

Action: Removing the abutment and pillar in waterway.

Modelling results indicate that in a 1% AEP event:

  • East of levee: reduces the water level by up to 150 mm
  • West of levee: reduces water level up to 400 mm and does not reduce the flood extent
  • East of the levee: 2 fewer properties would experience water above the floor level
  • West of the levee: 1 less property would experience water above the floor level
  • Outcomes similar to vegetation removal option

Click maps to enlarge

Mitigation option 5: Raising and extending the Newstead levee and vegetation removal

Action: Raising and extending the existing alignment of the levee with vegetation removal.

Modelling results indicate that in a 1% AEP event:

  • East of the levee: water is contained.
  • West of the levee: water levels go up slightly, in some locations along the Loddon River by up to 25 cm.
  • 88 fewer properties East of the levee would experience water above the floor level.
  • No additional properties West of levee would experience water above the floor level.

Click maps to enlarge